共 13 条
[1]
Afentakis P., Bavish B., Karmarkar V., Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems, Management Science, 30, pp. 222-239, (1984)
[2]
Bard J.F., A heuristic for minimizing the number of tool switches on a flexible machine, IIE Transactions, 20, pp. 382-391, (1988)
[3]
Bard J.F., Feo T.A., Operations sequencing in discrete parts manufacturing, Management Science, 35, pp. 249-255, (1989)
[4]
Carrie A.S., Perera D., Work scheduling in FMS under tool availability constrainIS, I Ntemational Journal of Production Research, 24, pp. 1299-1308, (1986)
[5]
Elsaved E.A., Algorithm for project scheduling with resource constraints, International Journal of Production Research, 20, pp. 95-103, (1982)
[6]
Giffler R., Mathematical solutions of parts requirements problems, Management Science, 2, pp. 847-867, (1965)
[7]
Gilbert N.N., Economics of Machining: Machining Theory and Practice, pp. 465-485, (1950)
[8]
Harris C.G., Williams J.H., Davis A., Condition monitoring of machine tools, International Journal of Production Research, 27, pp. 1445-1464, (1989)
[9]
El Gomavel J.I., Bregger K.D., On-line tool wear sensing for turning operations, Journal of Engineering for Industry, 105, pp. 44-47, (1986)
[10]
Kendall L.A., Bayoumi A., Automated tool-wear monitoring and tool changing using intelligent supervisory control, International Journal of Production Research, 26, pp. 1619-1628, (1988)