A COMPARISON OF SCHEDULING PHILOSOPHIES FOR MANUFACTURING CELLS

被引:19
作者
ASKIN, RG
IYER, A
机构
[1] Department of Systems and Industrial Engineering, The University of Arizona, Tucson
关键词
CELLULAR MANUFACTURING; GROUP TECHNOLOGY; SCHEDULING;
D O I
10.1016/0377-2217(93)90027-K
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we compare three approaches for assigning workers to tasks and controlling the movement of jobs through cellular manufacturing systems. The objective is to minimize throughput time for part batches. The scheduling approaches considered include 1) individual machine loading with batches being sequenced on a first come, first served basis; 2) a cell dedication strategy wherein the cell is devoted to a single product type at a time; and 3) a job enrichment strategy where each batch is assigned to a single, cross-trained operator who must perform all batch operations. The approaches are compared by queueing approximations and simulation over a variety of conditions. Dedicated cells are shown to perform best when cells are large, with balanced workloads and large lot sizes. Assigning batches to cross-trained workers may produce quality and morale advantages without adversely affecting throughput times as compared to traditional batch handling techiques, particularly if machines are not heavily utilized.
引用
收藏
页码:438 / 449
页数:12
相关论文
共 33 条
[1]   A COMPARATIVE-STUDY OF THE PERFORMANCE OF PURE AND HYBRID GROUP TECHNOLOGY MANUFACTURING SYSTEMS USING COMPUTER-SIMULATION TECHNIQUES [J].
ANG, CL ;
WILLEY, PCT .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (02) :193-233
[2]  
ASKIN RG, 1987, INT J PROD RES, V25, P101, DOI 10.1080/00207548708919825
[3]  
ASKIN RG, 1990, AUTOMATED FACTORY HD, P317
[4]   INTELLIGENT HEURISTIC FOR FMS SCHEDULING USING GROUPING [J].
BENARIEH, D ;
DROR, M .
JOURNAL OF INTELLIGENT MANUFACTURING, 1991, 2 (06) :387-395
[5]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[6]   A SIMPLE FORMULA FOR ESTIMATING THROUGHPUT OF SERIAL PRODUCTION LINES WITH VARIABLE PROCESSING TIMES AND LIMITED BUFFER CAPACITY [J].
BLUMENFELD, DE .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (06) :1163-1182
[7]  
BOUCHER TO, 1984, INT J PROD RES, V22, P85, DOI 10.1080/00207548408942432
[8]  
BUZACOTT JA, 1981, INT J PROD RES, V19, P255
[9]   AN INTEGRATED LAYOUT FOR GROUP TECHNOLOGY WITH IN-PROCESS INVENTORY COSTS [J].
CHAKRAVARTY, AK ;
SHTUB, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :431-442
[10]   THE ROLE OF WORK-IN-PROCESS INVENTORY IN SERIAL PRODUCTION LINES [J].
CONWAY, R ;
MAXWELL, W ;
MCCLAIN, JO ;
THOMAS, LJ .
OPERATIONS RESEARCH, 1988, 36 (02) :229-241