Neural-network prediction with noisy predictors

被引:11
作者
Ding, AA [1 ]
机构
[1] Northeastern Univ, Dept Math, Boston, MA 02115 USA
来源
IEEE TRANSACTIONS ON NEURAL NETWORKS | 1999年 / 10卷 / 05期
关键词
measurement error model; short-term load forecasting (STLF);
D O I
10.1109/72.788658
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Very often the input variables for neural-network predictions contain measurement errors, In particular, this may happen because the original input variables are often not available at the time of prediction and have to be replaced by predicted values themselves. This issue is usually ignored and results in nonoptimal predictions. This paper shows that under some general conditions, the optimal prediction using noisy input variables can be represented by a neural network with the same structure and the same weights as the optimal prediction using exact input variables, Only the activation functions have to be adjusted. Therefore me can achieve optimal prediction without costly retraining of the neural network. We explicitly provide an exact formula for adjusting the activation functions in a logistic network with Gaussian measurement errors in input variables. This approach is illustrated by an application to short-term load forecasting.
引用
收藏
页码:1196 / 1203
页数:8
相关论文
共 28 条
[1]  
Carroll Raymond J., 1995, MEASUREMENT ERROR NO, DOI DOI 10.1007/978-1-4899-4477-1
[2]   NEURAL NETWORKS - A REVIEW FROM A STATISTICAL PERSPECTIVE [J].
CHENG, B ;
TITTERINGTON, DM .
STATISTICAL SCIENCE, 1994, 9 (01) :2-30
[3]   Neural network based short-term load forecasting using weather compensation [J].
Chow, TWS ;
Leung, CT .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (04) :1736-1742
[4]   RECURRENT NEURAL NETWORKS AND ROBUST TIME-SERIES PREDICTION [J].
CONNOR, JT ;
MARTIN, RD ;
ATLAS, LE .
IEEE TRANSACTIONS ON NEURAL NETWORKS, 1994, 5 (02) :240-254
[5]  
Cybenko G., 1989, Mathematics of Control, Signals, and Systems, V2, P303, DOI 10.1007/BF02551274
[6]  
ENGLE R, 1992, CONSTRUCTION PUGET S
[7]   SHORT-TERM LOAD FORECASTING [J].
GROSS, G ;
GALIANA, FD .
PROCEEDINGS OF THE IEEE, 1987, 75 (12) :1558-1573
[8]   A METHOD FOR PLANNING ECONOMIC UNIT COMMITMENT AND MAINTENANCE OF THERMAL POWER SYSTEMS [J].
HARA, K ;
KIMURA, M ;
HONDA, N .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1966, PA85 (05) :427-&
[9]   USING ADDITIVE NOISE IN BACK-PROPAGATION TRAINING [J].
HOLMSTROM, L ;
KOISTINEN, P .
IEEE TRANSACTIONS ON NEURAL NETWORKS, 1992, 3 (01) :24-38
[10]   Prediction intervals for artificial neural networks [J].
Hwang, JTG ;
Ding, AA .
JOURNAL OF THE AMERICAN STATISTICAL ASSOCIATION, 1997, 92 (438) :748-757