Multi-product planning and scheduling using genetic algorithm approach

被引:40
作者
Ip, WH [1 ]
Li, Y
Man, KF
Tang, KS
机构
[1] Hong Kong Polytech Univ, Dept Mfg Engn, Hong Kong, Peoples R China
[2] City Univ Hong Kong, Dept Elect Engn, Hong Kong, Peoples R China
关键词
production scheduling and planning; genetic algorithm; MRP/ERP; JIT;
D O I
10.1016/S0360-8352(00)00044-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Earliness and tardiness production scheduling and planning (ETPSP) have been studied by a number of researchers in recent years. However, the existing researches have been limited to the study of machine scheduling, and the effects of multi-product production, with the considerations of machine scheduling and lot-size and capacity are not being investigated. One of the reasons for this is the complexity of solving large-scale discrete problems where restrictions of linearity, convexity and differentiability prevail. Classical optimization methods have proved inadequate and an alternative approach is investigated here. A new extensive model of ETPSP is developed in this paper to address the multi-product production environment. A genetic algorithm (GA) is applied in order to obtain an optimal solution for this large-scale problem. The investigation demonstrates the use of a comprehensive model to represent a real life manufacturing environment and illustrates the fact that a solution can be effectively and efficiently obtained using the GA approach. (C) 2000 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:283 / 296
页数:14
相关论文
共 15 条
[1]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[2]  
DE J, 1991, COMPUTER OPERATION R, V18, P465
[3]   ON THE GENERAL-SOLUTION FOR A CLASS OF EARLY TARDY PROBLEMS [J].
DE, P ;
GHOSH, JB ;
WELLS, CE .
COMPUTERS & OPERATIONS RESEARCH, 1993, 20 (02) :141-149
[4]  
GESSENER RA, 1986, MASTER PRODUCTION SC
[5]   EARLINESS-TARDINESS SCHEDULING PROBLEMS .1. WEIGHTED DEVIATION OF COMPLETION TIMES ABOUT A COMMON DUE DATE [J].
HALL, NG ;
POSNER, ME .
OPERATIONS RESEARCH, 1991, 39 (05) :836-846
[7]   OPTIMAL HYBRID PUSH-PULL CONTROL STRATEGIES FOR A PARALLEL MULTISTAGE SYSTEM .1. [J].
HODGSON, TJ ;
WANG, DW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (06) :1279-1287
[8]  
LI Y, 1996, J SYSTEM ENG THEORY, V16, P7
[9]   SYNTHESIS AND CHARACTERIZATION OF ULTRAFINE SI POWDERS FROM LASER-INDUCED SIH4 GAS REACTIONS [J].
LI, YL ;
LIANG, Y ;
XIAO, KS ;
ZHENG, F ;
HU, ZQ .
NANOSTRUCTURED MATERIALS, 1995, 5 (01) :1-9
[10]   Genetic algorithms: Concepts and applications [J].
Man, KF ;
Tang, KS ;
Kwong, S .
IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 1996, 43 (05) :519-534