共 14 条
[1]
ANJO K, 1968, ELECTR ENG JPN, V88, P83
[2]
BLASUBRAMANIAN R, 1976, P I ELECTR ENG, V123, P537
[4]
OVERVOLTAGES DUE TO LINE ENERGIZATION AND REENERGIZATION VERSUS OVERVOLTAGES CAUSED BY FAULTS AND FAULT CLEARING IN EHV SYSTEMS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1970, PA89 (05)
:932-&
[5]
CORNICK KI, 1981, P I ELECTR ENG, V128, P18
[6]
SINGLE-PHASE SWITCHING TESTS ON THE AEP 765 KV SYSTEM - EXTINCTION TIME FOR LARGE SECONDARY ARC CURRENTS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1983, 102 (08)
:2775-2783
[7]
DIGITAL-SIMULATION OF FAULTED EHV TRANSMISSION-LINES WITH PARTICULAR REFERENCE TO VERY-HIGH-SPEED PROTECTION
[J].
PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON,
1976, 123 (04)
:353-359
[8]
JOHNS AT, 1984, P IEE C, V131, P67
[9]
JOHNS AT, 1982, P I ELECTR ENG, V129, P49
[10]
STAGED FAULT-TESTS WITH SINGLE-PHASE RECLOSING ON THE WINNIPEG-TWIN CITIES 500KV INTERCONNECTION
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1982, 101 (03)
:662-673