LABOR PRODUCTIVITY AND WORK SAMPLING - THE BOTTOM LINE

被引:53
作者
THOMAS, HR
机构
[1] Pennsylvania Transp. Inst., The Pennsylvania State Univ., University Park, PA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1991年 / 117卷 / 03期
关键词
D O I
10.1061/(ASCE)0733-9364(1991)117:3(423)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper describes the relationship between labor productivity and direct work as reported in work-sampling studies. Seven data bases, collected primarily from nuclear-power-plant construction projects, are used. Investigations of a 30-project data base show that direct work is better in the winter than during the rest of the year, is best during the start-up and testing phase, and has improved since the Three Mile Island accident. It is concluded that these results are illogical. Using linear regression models, the paper shows that direct work is not related to productivity. This conclusion is based on three assumption: Reducing wait time leads to increased direct-work time, increased direct-work time leads to better productivity, and better productivity is accompanied by less time spent waiting. Each assumption is tested, and the model statistics show very poor correlations and predictive capabilities. The most reliable data base, consisting of 46 data points, yielded an r(a)2 value of 0.00 and a standard error of the estimate that is equal to the standard deviation of the performance measure. The conclusion is that work-sampling studies show how busy the crafts are, and the results cannot be used to predict labor productivity or to quantify inefficient work hours.
引用
收藏
页码:423 / 444
页数:22
相关论文
共 13 条
[1]  
Handa V.K., Abdalla O., Forecasting productivity by work sampling, Constr. Mgmt. Econ, 7, pp. 19-28, (1989)
[2]  
Liou F., A Statistical Study on Work Sampling and Unit Rate Productivity for Power Plants, (1984)
[3]  
Liou F., Borcherding J.D., Work samling can predict unit rate productivity, J. Constr. Engrg. Mgmt, 112, 1, pp. 90-103, (1986)
[4]  
Logcher R.D., Collins W.C., Management impacts on labor productivity, J. Constr. Div, 104, 4, pp. 447-461, (1978)
[5]  
Oglesby C., Parker H., Howell G., Productivity Improvement in Construction, (1989)
[6]  
Richardson W., Cost Improvement, Work Sampling, and Short Interval Scheduling, (1976)
[7]  
Rogge D.F., Tucker R.L., Foreman-delay surveys: Work sampling and output, J. Constr. Div, 108, 4, pp. 592-604, (1982)
[8]  
Thomas H.R., Construction work sampling, Business Roundtable, (1981)
[9]  
Thomas H.R., Games people play with work sampling, J. Constr. Div, 108, 1, pp. 13-22, (1982)
[10]  
Thomas H.R., Guevara J.M., Gustenhoven C.T., Improving productivity estimates by work sampling, J. Constr. Engrg. Mgmt, 110, 2, pp. 178-188, (1984)