PILOT-PLANT STUDIES ON TANNERY WASTE-WATER TREATMENT WITH THE OBJECTIVE TO REDUCE SLUDGE PRODUCTION

被引:15
作者
SZPYRKOWICZ, L
RIGONISTERN, S
GRANDI, FZ
机构
关键词
TANNERY WASTE WATER; BIOLOGICAL TREATMENT PLANT; NITRIFICATION-DENITRIFICATION; SLUDGE PRODUCTION REDUCING; NITROGEN REMOVAL YIELD;
D O I
10.2166/wst.1991.0642
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The objective of the work was to verify the possibility to reduce the quantity of the sludge produced during the treatment of chrome tannery waste waters. The modified Ludzack-Ettinger process for high nitrogen content waste waters was tested without a chemical-physical pretreatment, normally adopted to eliminate from the tannery waste waters the compounds potentially inhibitory for biological processes. The results obtained in a pilot plant during 4 runs differing in waste waters flow and strength and in MLSS recycling ratio demonstrate the lack of inhibition of denitrification and nitrification by a high content of sulphides and chromium. In the comparison with traditional treatment of tannery waste waters the 60% reduction of the sludge to be wasted and the improvement of a final effluent quality were achieved. The mean overall rate of COD and N removal was 0.38 mgCOD/mgMLVSSxday and 0.125 mgN/mgMLVSSxday, respectively.
引用
收藏
页码:1863 / 1871
页数:9
相关论文
共 13 条
[1]  
ABUFAYED AA, 1986, J WATER POLLUT CON F, V58, P387
[2]  
ABUFAYED AA, 1986, J WATER POLLUT CON F, V58, P398
[3]  
[Anonymous], 1985, STANDARD METHODS EXA
[4]  
ARGAMAN Y, 1986, J WATER POLLUT CON F, V58, P853
[5]  
BERK WL, 1982, J AM LEATHER CHEM AS, V77, P38
[6]  
CROATTO U, 1982, CUOIO PELLI MAT CONC, V8, P605
[7]  
EKAMA GA, 1984, THEORY DESIGN OPERAT, P6
[8]  
GHIMENTI G, 1988, ACQUE REFLUE FANGHI, V1, P308
[9]  
KOZIOROWSKI B, 1980, OCZYSZCZANIE SCIEKOW, P431
[10]  
PANZER CC, 1981, J WATER POLLUT CON F, V53, P1434