SIMULATION STUDY OF JOB SHOP SCHEDULING WITH DUE DATES

被引:6
作者
CHENG, TCE
机构
[1] Univ of Manitoba, Winnipeg, Manit,, Can, Univ of Manitoba, Winnipeg, Manit, Can
关键词
D O I
10.1080/00207728808967610
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
10
引用
收藏
页码:383 / 390
页数:8
相关论文
共 10 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P228
[3]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P123
[4]  
DZIELINSKI BP, 1960, MGMT SCI, V6, P311
[5]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[6]  
EILON S, 1968, INT J PROD RES, V7, P135, DOI DOI 10.1080/00207546808929803
[7]  
Eilon S, 1967, INT J PROD RES, V6, P1
[8]  
ELVERS DA, 1973, J AM PRODUCTION INVE, V14, P62
[9]  
Jackson JR., 1957, NAV RES LOGIST Q, V4, P287, DOI [10.1002/nav.3800040404, DOI 10.1002/NAV.3800040404]
[10]  
LEGRANDE E, 1963, MANAGEMENT TECHNOLOG, V3, P1