PRICING CONSTRUCTION RISK - FUZZY SET APPLICATION

被引:60
作者
PAEK, JH
LEE, YW
OCK, JH
机构
[1] Dept. of Constr. Mgmt., Univ. of Nebraska, Lincoln
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1993年 / 119卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1993)119:4(743)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Contractors may be faced with the problem of deciding the bidding price of a construction project, when the likelihood of the occurrence of risk events and the risk-associated consequences (monetary loss and gain) are uncertain. If the monetary loss resulting from risk events is not considered or is underestimated due to associated uncertainties, a construction enterprise may suffer a tremendous loss and eventually fail. In this paper, a risk-pricing method is proposed for analyzing and pricing construction project risk. The method consists of identifying risk elements and quantifying risk-associated consequences. The uncertainty in the values of the quantified consequences are represented by using a fuzzy set approach and incorporated directly into the bidding price decision process. The proposed risk-pricing method will assist contractors in the process of estimation under uncertainty. A real construction project is selected to illustrate how the proposed method can be put into practice.
引用
收藏
页码:743 / 756
页数:14
相关论文
共 12 条
  • [1] Al-Bahar J., Crandall K., Systematic risk management approach for construction project, J. Constr. Engrg. and Mgmt, 118, 2, pp. 533-547, (1990)
  • [2] Anandalingam G., Westfall M., Selection of hazardous waste disposal alternative using multi-attribute utility theory and fuzzy set analysis, J. Environ. Syst, 18, 1, pp. 69-85, (1988)
  • [3] Bogardi I., Bardossy A., Regional management of an aquifer for mining under fuzzy environmental objectives, Water Resour. Res, 19, 6, pp. 1394-1402, (1983)
  • [4] Chen S.H., Ranking fuzzy numbers with maximizing set and minimizing set, Fuzzy Sets Syst, 17, 2, pp. 113-129, (1985)
  • [5] Frano A., Pricing hazardous-waste risk revisited, J. Mgmt. Engrg, 7, 4, pp. 428-438, (1991)
  • [6] Klir G.J., Folger T.A., Fuzzy Sets, Uncertainty, and Information, (1988)
  • [7] Lee Y.W., Bogardi I., Stansbury J., Fuzzy decision-making in dredged material management, J. Environ. Engrg, 117, 5, pp. 614-630, (1991)
  • [8] Paek J.H., The first step for strategic environmental project management: Environmental cleanup project contract, Conf. on Design and Construction Issues, pp. 500-512, (1991)
  • [9] Paek J.H., Lee Y.W., Napier T.R., Selection of design/build proposal using a fuzzy logic system, J. Constr. Engrg. and Mgmt, 118, 2, pp. 303-317, (1992)
  • [10] Park W., Construction Bidding for Profit, pp. 168-177, (1979)