A STATE-OF-THE-ART REVIEW OF PARALLEL-MACHINE SCHEDULING RESEARCH

被引:371
作者
CHENG, TCE [1 ]
SIN, CCS [1 ]
机构
[1] UNIV WATERLOO,DEPT MANAGEMENT SCI,WATERLOO N2L 3G1,ONTARIO,CANADA
基金
加拿大自然科学与工程研究理事会;
关键词
classification; Scheduling; sequencing;
D O I
10.1016/0377-2217(90)90215-W
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper the major research results in deterministic parallel-machine scheduling theory will pass a survey. The review reveals that there exist a lot of potential areas worthy of further research. © 1990.
引用
收藏
页码:271 / 292
页数:22
相关论文
共 113 条
  • [1] BOUNDS ON SCHEDULES FOR INDEPENDENT TASKS WITH SIMILAR EXECUTION TIMES
    ACHUGBUE, JO
    CHIN, FY
    [J]. JOURNAL OF THE ACM, 1981, 28 (01) : 81 - 99
  • [2] [Anonymous], 1971, STOC 71, DOI DOI 10.1145/800157.805047
  • [3] Baker K., 1974, INTRO SEQUENCING SCH
  • [4] SCHEDULING WITH PARALLEL PROCESSORS AND LINEAR DELAY COSTS
    BAKER, KR
    MERTEN, AG
    [J]. NAVAL RESEARCH LOGISTICS, 1973, 20 (04) : 793 - 804
  • [5] Barnes J. W., 1977, AIIE Transactions, V9, P25, DOI 10.1080/05695557708975117
  • [6] Bellman R., 1982, MATH ASPECTS SCHEDUL
  • [7] NEW TRENDS IN MACHINE SCHEDULING
    BLAZEWICZ, J
    FINKE, G
    HAUPT, R
    SCHMIDT, G
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 37 (03) : 303 - 317
  • [8] Brucker P., 1977, Mathematics of Operations Research, V2, P275, DOI 10.1287/moor.2.3.275
  • [9] SCHEDULING INDEPENDENT TASKS TO REDUCE MEAN FINISHING TIME
    BRUNO, J
    COFFMAN, EG
    SETHI, R
    [J]. COMMUNICATIONS OF THE ACM, 1974, 17 (07) : 382 - 387
  • [10] BRUNO JL, 1985, ACTA INFORM, V22, P333, DOI 10.1007/BF00265685