POWER-GENERATION SCHEDULING FOR MULTIAREA HYDROTHERMAL SYSTEMS WITH TIE LINE CONSTRAINTS, CASCADED RESERVOIRS AND UNCERTAIN DATA

被引:49
作者
WANG, C
SHAHIDEHPOUR, SM
机构
[1] Department of Electrical and Computer Engineering, Illinois Institute of Technology, Chicago
关键词
UNIT COMMITMENT; ECONOMIC DISPATCH; HYDROTHERMAL COORDINATION; PROBABILITY; NETWORK FLOW; REDUCED GRADIENT METHOD;
D O I
10.1109/59.260860
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a new approach to solve the short-term generation scheduling of large-scale hydro-thermal power systems(GSHT). The objective of GSHT is to minimize the total operation cost of thermal units over the scheduling time horizon. In order to solve the problem within a reasonable time, the problem is decomposed into thermal and hydro subproblems. The coordinator between these subproblems is the system Lagrange multiplier. For the thermal subproblem, in a multi-area power pool, it is necessary to coordinate the area generations for reducing the operation cost without violating tie limits. A probabilistic method is employed in considering load forecasting errors and forced outages of generating units to satisfy system reliability requirements. For the hydro subsystem, network flow concepts axe adopted to coordinate water usage over the entire study time span and the reduced gradient method is used to overcome the linear characteristic of the network flow method in order to obtain the optimal solution. Three case studies for the proposed method axe presented.
引用
收藏
页码:1333 / 1340
页数:8
相关论文
共 17 条
  • [1] [Anonymous], 1980, NETWORK FLOW PROGRAM
  • [2] Avriel M, 2003, NONLINEAR PROGRAMMIN
  • [3] OPTIMAL SHORT-TERM OPERATION PLANNING OF A LARGE HYDROTHERMAL POWER-SYSTEM BASED ON A NONLINEAR NETWORK FLOW CONCEPT
    BRANNLUND, H
    SJELVGREN, D
    ANDERSSON, N
    BUBENKO, JA
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1986, 1 (04) : 75 - 82
  • [4] LI S, 1992, IN PRESS IEEE T POWE
  • [5] PEREIRA MVF, 1982, IEEE T POWER AP SYST, V101, P3851, DOI 10.1109/TPAS.1982.317035
  • [6] A NEW METHOD FOR THE EVALUATION OF EXPECTED ENERGY GENERATION AND LOSS OF LOAD PROBABILITY
    SCHENK, KF
    MISRA, RB
    VASSOS, S
    WEN, W
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1984, 103 (02): : 294 - 303
  • [7] STOCHASTIC LONG-TERM HYDROTHERMAL OPTIMIZATION FOR A MULTIRESERVOIR SYSTEM
    SHERKAT, VR
    CAMPO, R
    MOSLEHI, K
    LO, EO
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1985, 104 (08): : 2040 - 2050
  • [8] OPTIMAL OPERATIONS PLANNING IN A LARGE HYDROTHERMAL POWER SYSTEM
    SJELVGREN, D
    ANDERSSON, S
    ANDERSSON, T
    NYBERG, U
    DILLON, TS
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1983, 102 (11): : 3644 - 3651
  • [9] SOARES S, 1980, IEEE T POWER APPARAT, V99, P1106
  • [10] HYDROTHERMAL UNIT COMMITMENT WITH PROBABILISTIC CONSTRAINTS USING SEGMENTATION METHOD
    TONG, SK
    SHAHIDEHPOUR, SM
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (01) : 276 - 282