A HEURISTIC SCHEDULING POLICY FOR MULTI-ITEM, SINGLE-MACHINE PRODUCTION SYSTEMS WITH TIME-VARYING, STOCHASTIC DEMANDS

被引:63
作者
LEACHMAN, RC [1 ]
GASCON, A [1 ]
机构
[1] UNIV LAVAL,FAC SCI ADM,DEPT OPERAT & SYST DECIS,QUEBEC CITY G1K 7P4,QUEBEC,CANADA
关键词
D O I
10.1287/mnsc.34.3.377
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:377 / 390
页数:14
相关论文
共 17 条
[1]  
Dixon P, 1981, J OPERATIONS MANAGEM, V2, P23
[2]   THE DYNAMIC LOT-SIZING PROBLEM FOR MULTIPLE ITEMS UNDER LIMITED CAPACITY [J].
DOGRAMACI, A ;
PANAYIOTOPOULOS, JC ;
ADAM, NR .
AIIE TRANSACTIONS, 1981, 13 (04) :294-303
[3]   ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
DOLL, CL ;
WHYBARK, DC .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :50-55
[4]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[5]  
GASCON A, 1984, THESIS U CALIFORNIA
[6]  
GASCON A, IN PRESS OPER RES
[7]  
GLASSEY CR, 1968, OPER RES, V16, P343
[8]   THE MULTI-PRODUCT PRODUCTION CYCLING PROBLEM [J].
GRAVES, SC .
AIIE TRANSACTIONS, 1980, 12 (03) :233-240
[9]  
HAESSLER RW, 1979, AIIE T, V11, P336, DOI 10.1080/05695557908974480
[10]  
LEACHMAN RC, 1985, 8515 U LAV FS ADM DO