COST-COMPLETION-DATE TRADEOFFS IN TRANSPORTATION PROBLEM

被引:10
作者
GLICKMAN, TS [1 ]
BERGER, PD [1 ]
机构
[1] BOSTON UNIV,BOSTON,MA 02215
关键词
D O I
10.1287/opre.25.1.163
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:163 / 168
页数:6
相关论文
共 7 条
[1]  
BERGER PD, 1974, Z OPNS RES, V18, pB1
[2]   BOTTLENECK TRANSPORTATION PROBLEM [J].
GARFINKEL, RS ;
RAO, MR .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1971, 18 (04) :465-+
[3]   COMPUTATION STUDY ON START PROCEDURES, BASIS CHANGE CRITERIA, AND SOLUTION ALGORITHMS FOR TRANSPORTATION PROBLEMS [J].
GLOVER, F ;
KARNEY, D ;
KLINGMAN, D ;
NAPIER, A .
MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 20 (05) :793-813
[4]  
HAMMER PL, 1969, NAV RES LOGIST Q, V16, P345
[5]   CRITICAL-PATH PLANNING AND SCHEDULING - MATHEMATICAL BASIS [J].
KELLEY, JE .
OPERATIONS RESEARCH, 1961, 9 (03) :296-320
[6]  
Roy B., 1971, MATH PROGRAM, V1, P239, DOI [DOI 10.1007/BF01584088, 10.1007/BF01584088]
[7]  
SRINIVASAN V, 1973, ACM, V20, P194