SLEIPNER-VEST CO2 DISPOSAL - INJECTION OF REMOVED CO2 INTO THE UTSIRA FORMATION

被引:139
作者
KORBOL, R
KADDOUR, A
机构
[1] Sleipner Vest Project, Projects Department, Esso Norge AS
关键词
4;
D O I
10.1016/0196-8904(95)00055-I
中图分类号
O414.1 [热力学];
学科分类号
摘要
Production from the Sleipner Vest Field, containing up to 9,5% CO2, starts October 1, 1996. The Sleipner Vest gas will be delivered under the Troll Gas Sales Agreements, and hence has to meet the sales specification of maximum 2,5% by volume CO2 in the gas. The amount of removed CO2 would be approximately 1 million metric ton per year. For environmental reasons the CO2 will be injected into an underground aquifer.
引用
收藏
页码:509 / 512
页数:4
相关论文
共 3 条
[1]  
Statoil, Sleipner Vest Reservoir Technology, Supporting Documentation to Plan for Development and Operation of Sleipner Vest, 2, (1991)
[2]  
Statoil, Sleipner Vest Carbondioxide Disposal in the Utsira Formation, (1991)
[3]  
Statoil, Sleipner Vest Conceptual Report, (1993)