SIMULTANEOUS SYNTHESIS, SIZING, AND SCHEDULING OF MULTIPRODUCT BATCH PLANTS

被引:32
作者
BIREWAR, DB [1 ]
GROSSMANN, IE [1 ]
机构
[1] CARNEGIE MELLON UNIV,DEPT CHEM ENGN,PITTSBURGH,PA 15213
关键词
D O I
10.1021/ie00107a008
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The procedure for synthesis, sizing, an scheduling of multiproduct batch plants can be summarized as follows: Step 1. Based on the given problem data, add to the initial unit list superunits that account for all possible mergings of tasks as described in the section on representation of alternatives. Step 2. Formulate the MINLP corresponding to the selected scheduling policy and to the option for parallel equipment (MINLP1, MINLP2, or MINLP3): 1. Solve the MINLP. 2. Round off the number of batches obtained in the solution to the lower integer and solve the corresponding NLP for the plant structure obtained from the MINLP. Step 3. Using the values obtained for the variables NPRSikin the MINLP solution, derive the schedule that enables the required amount of products to be manufactured in the new plant in the given horizon time. The schedule is derived by using the graph representation and algorithm developed by Birewar and Grossmann (1989b). © 1990, American Chemical Society. All rights reserved.
引用
收藏
页码:2242 / 2251
页数:10
相关论文
共 13 条
  • [1] INCORPORATING SCHEDULING IN THE OPTIMAL-DESIGN OF MULTIPRODUCT BATCH PLANTS
    BIREWAR, DB
    GROSSMANN, IE
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1989, 13 (1-2) : 141 - 161
  • [2] EFFICIENT OPTIMIZATION ALGORITHMS FOR ZERO-WAIT SCHEDULING OF MULTIPRODUCT BATCH PLANTS
    BIREWAR, DB
    GROSSMANN, IE
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1989, 28 (09) : 1333 - 1345
  • [3] BROOKE A, 1988, GAMS USERS MANUAL
  • [4] OPTIMUM DESIGN OF MULTIPURPOSE CHEMICAL-PLANTS
    GROSSMANN, IE
    SARGENT, RWH
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1979, 18 (02): : 343 - 348
  • [5] Klossner J., 1984, AICHE ANN M SAN FRAN
  • [6] OPTIMAL-DESIGN OF BATCH SEMI-CONTINUOUS PROCESSES
    KNOPF, FC
    OKOS, MR
    REKLAITIS, GV
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1982, 21 (01): : 79 - 80
  • [7] DESIGN OF MULTIPRODUCT BATCH PROCESSES WITH FINITE INTERMEDIATE STORAGE
    MODI, AK
    KARIMI, IA
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1989, 13 (1-2) : 127 - 139
  • [8] MURTAGH BA, 1985, MINOS USERS MANUAL
  • [9] CHOICE OF EQUIPMENT SIZES FOR MULTIPRODUCT BATCH PLANTS - HEURISTICS VS BRANCH AND BOUND
    SPARROW, RE
    FORDER, GJ
    RIPPIN, DWT
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1975, 14 (03): : 197 - 203
  • [10] VISWANATHAN J, 1989, TIMS ORSA M VANCOUVE