OPTIMAL SCHEDULES FOR SPECIAL STRUCTURE FLOWSHOPS

被引:12
作者
GUPTA, JND [1 ]
机构
[1] POSTAL SERV,WASHINGTON,DC
关键词
D O I
10.1002/nav.3800220205
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:255 / 269
页数:15
相关论文
共 12 条
[1]  
Conway R, 1967, THEORY SCHEDULING
[2]   DEVELOPMENT OF M-STAGE DECISION RULE FOR SCHEDULING N JOBS THROUGH M MACHINES [J].
DUDEK, RA ;
TEUTON, OF .
OPERATIONS RESEARCH, 1964, 12 (03) :471-&
[3]  
ELMAGHRABY SE, 1968, NAV RES LOGIST Q, V15, P205
[4]  
Gupta J.N.D., 1971, INT J PROD RES, V9, P267
[5]  
Gupta Jatinder N. D., 1971, AIIE T, V3, P199
[6]  
GUPTA JND, 1971, J OPER RES SOC JPN, V13, P167
[7]  
Johnson S. M., 1954, NAV RES LOGIST Q, V1, P61, DOI DOI 10.1002/NAV.3800010110
[8]  
NABESHIM.I, 1967, J OPER RES SOC JPN, V10, P1
[9]  
NABESHIMA I, 1961, J OPERATIONS RESEARC, V3, P170
[10]  
SMITH ML, 1968, THESIS TEXAS TECHNOL