MULTIITEM LOTSIZING IN CAPACITATED MULTISTAGE SERIAL SYSTEMS

被引:8
作者
BILLINGTON, P
BLACKBURN, J
MAES, J
MILLEN, R
VANWASSENHOVE, LN
机构
[1] VANDERBILT UNIV,OWEN GRAD SCH MANAGEMENT,NASHVILLE,TN 37203
[2] MASTER FOODS NV,OLEN,BELGIUM
[3] NORTHEASTERN UNIV,COLL BUSINESS ADM,BOSTON,MA 02115
[4] UNSEAD,TECHNOL MANAGEMENT AREA,FONTAINEBLEAU,FRANCE
关键词
D O I
10.1080/07408179408966591
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research deals with the capacitated, multi-item, multi-stage lotsizing problem for serial systems by examining the performance of heuristics found effective for the capacitated multiple-product, single-stage problem. The items have proportional processing requirements across stages; that is, if item 1 requires twice the processing time of item 2 at one stage, it requires twice the processing requirements at all other stages. The single-stage heuristics included in the study are: Dixon/Silver, Lambrecht/Vanderveken, the Dogramaci, Panyiotopoulos and Adam (both single and multi-pass), and different versions of the ABC heuristic of Maes and Van Wassenhove. These heuristics have been altered in two ways. First, they allow for the inclusion of the cost modification procedures developed by Blackburn and Millen. Second, the feasibility routines have been modified to work in multi-stage environments. Both modifications attempt to coordinate decisions made across stages concerning lotsizes. Experiments were conducted to determine the relative performance of these methods. The experimental design factors include: the TBOs (or time between orders), the coefficient of variation of demand, the capacity available at each stage, the number of products, and the number of stages.
引用
收藏
页码:12 / 18
页数:7
相关论文
共 13 条
[1]   DETERMINING LOT SIZES AND RESOURCE REQUIREMENTS - A REVIEW [J].
BAHL, HC ;
RITZMAN, LP ;
GUPTA, JND .
OPERATIONS RESEARCH, 1987, 35 (03) :329-345
[2]  
BILLINGTON P, 1990, MULTIPRODUCT SCHEDUL
[3]   IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS [J].
BLACKBURN, JD ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1982, 28 (01) :44-56
[4]   SIMULTANEOUS LOT-SIZING AND CAPACITY PLANNING IN MULTI-STAGE ASSEMBLY PROCESSES [J].
BLACKBURN, JD ;
MILLEN, RA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1984, 16 (01) :84-93
[5]  
Dixon P, 1981, J OPERATIONS MANAGEM, V2, P23
[6]   THE DYNAMIC LOT-SIZING PROBLEM FOR MULTIPLE ITEMS UNDER LIMITED CAPACITY [J].
DOGRAMACI, A ;
PANAYIOTOPOULOS, JC ;
ADAM, NR .
AIIE TRANSACTIONS, 1981, 13 (04) :294-303
[7]  
Florian M., 1980, MANAGE SCI, V26, P12
[8]  
LAMBRECHT MR, 1979, AIIE T, V11, P319, DOI 10.1080/05695557908974478
[9]  
LOVE SF, 1972, MANAGEMENT SCI, V18
[10]   A SIMPLE HEURISTIC FOR THE MULTI ITEM SINGLE LEVEL CAPACITATED LOTSIZING PROBLEM [J].
MAES, J ;
VANWASSENHOVE, LN .
OPERATIONS RESEARCH LETTERS, 1986, 4 (06) :265-273