共 15 条
[1]
BAGCHI U, 1987, NAV RES LOG, V34, P739, DOI 10.1002/1520-6750(198710)34:5<739::AID-NAV3220340513>3.0.CO
[2]
2-3
[4]
SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP
[J].
MANAGEMENT SCIENCE,
1984, 30 (09)
:1093-1104
[5]
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[7]
MINIMIZING A QUADRATIC FUNCTION OF JOB LATENESS ON A SINGLE-MACHINE
[J].
ENGINEERING COSTS AND PRODUCTION ECONOMICS,
1983, 7 (03)
:187-194