SCHEDULING JOBS WITH LINEAR DELAY PENALTIES AND SEQUENCE DEPENDENT SETUP COSTS

被引:37
作者
BARNES, JW
VANSTON, LK
机构
关键词
D O I
10.1287/opre.29.1.146
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:146 / 160
页数:15
相关论文
共 21 条
[1]  
Agin N., 1966, Manage. Sci, V13, pB176
[2]  
[Anonymous], 1967, Theory of Scheduling
[3]  
Barnes J. W., 1977, AIIE Transactions, V9, P25, DOI 10.1080/05695557708975117
[4]   SCHEDULING A BACKLOG OF OILWELL WORKOVERS [J].
BARNES, JW ;
BRENNAN, JJ ;
KNAPP, RM .
JOURNAL OF PETROLEUM TECHNOLOGY, 1977, 29 (DEC) :1651-1653
[5]  
BARNES JW, 1976, UT763 U TEX U DIV TE
[6]   TRAVELING SALESMAN PROBLEM - A SURVEY [J].
BELLMORE, M ;
NEHAUSE.GL .
OPERATIONS RESEARCH, 1968, 16 (03) :538-&
[7]   SHORTEST-ROUTE METHODS .1. REACHING, PRUNING, AND BUCKETS [J].
DENARDO, EV ;
FOX, BL .
OPERATIONS RESEARCH, 1979, 27 (01) :161-186
[8]  
ELMAGHRABY SE, 1967, J IND ENG, V18, P106
[9]  
Ford L. R. Jr., 1962, Flows in Networks
[10]   PRACTICAL SOLUTION OF LARGE MIXED INTEGER PROGRAMMING PROBLEMS WITH UMPIRE [J].
FORREST, JJH ;
HIRST, JPH ;
TOMLIN, JA .
MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 20 (05) :736-773