共 20 条
[1]
Sze, VLSI Technology, (1988)
[2]
Shimoyashiro, Manufacturing System for LSI Wafer Fabrication, Proceedings of the SEMI Technology Symposium, pp. 147-154, (1992)
[3]
Fordyce, Et al., LOGISTICS MANAGEMENT SYSTEM: AN ADVANCED DECISION SUPPORT SYSTEM FOR THE FOURTH DECISION TIER DISPATCH OR SHORT-INTERVAL SCHEDULING, Production and Operations Management, 1 v, pp. 70-86, (1992)
[4]
Uzsoy, Lee, Martin-Vega, A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING, IIE Transactions, 24 v, 4 n, pp. 47-61, (1992)
[5]
Uzsoy, Lee, Martin-Vega, A Review of Production Planning and Scheduling in the Semiconductor Industry, Part II: Shop Floor Control, Research Report, (1992)
[6]
Johri, Practical Issues in Scheduling and Dispatching in Semiconductor Wafer Fabrication, Journal of Manufacturing Systems, 12 v, 6 n, pp. 474-485, (1993)
[7]
Graves, Et al., Scheduling of Re-entrant Flow Shops, Journal of Operations Management, 3 v, pp. 197-203, (1983)
[8]
Hogg, Fowler, Flow Control in Semiconductor Manufacturing: A Survey and Projection of Needs, SEMATECH Non Classified Document No. 91110757A GEN, (1991)
[9]
Glassey, Resende, Closed-Loop Job Release Control for VLSI Circuit Manufacturing, IEEE Transactions on Semiconductor Manufacturing, 1 v, 1 n, pp. 36-46, (1988)
[10]
Wein, Scheduling Semiconductor Wafer Fabrication, IEEE Transactions on Semiconductor Manufacturing, 1 v, 3 n, pp. 115-130, (1988)