A FAST ALGORITHM FOR OPTIMAL HYDROTHERMAL SCHEDULING WITH CASCADED AND INDEPENDENT HYDRO PLANTS

被引:1
作者
MOHAN, MR
KUPPUSAMY, K
KHAN, MA
机构
[1] School of Electrical and Electronics Engineering, College of Engineering Anna University, Madras
来源
ELECTRIC MACHINES AND POWER SYSTEMS | 1993年 / 21卷 / 05期
关键词
D O I
10.1080/07313569308909684
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a fast algorithm for solving the short-term hydrothermal scheduling problem in a power system consisting of cascaded plants with time delay and independent hydro plants. The operational planning of such problem is concerned with the determination of scheduling for hydro as well as thermal plants to meet the daily system demand with the objective of minimizing the total fuel cost of the thermal plants over the day subject to the relevant operating constraints associated with the thermal and hydro plants. The algorithm employs a fast and simple alternating solution approach for hydrothermal scheduling in which the hydro subproblem is solved using the method of local variation while the associated thermal subproblem is solved through a judicious combination of successive Linear Programming (SLP) method and Participation Factor method. Many computational features are incorporated in the solution algorithm exploiting the inherent characteristic of the complex hydrothermal scheduling problem.
引用
收藏
页码:615 / 626
页数:12
相关论文
共 12 条
[1]  
Bernholtz B., Graham L.J., Hydrothermal economic scheduling part i solution by incremental dynamic programming, AIEE Trans. Power Apparatus and Systems, 79, pp. 921-932, (1960)
[2]  
Bonaert A.P., El-Abiad A.H., Koivo A.J., Optimal scheduling of hydrothermal power systems, IEEE Trans. Power Apparatus and Systems, 91, 1, pp. 263-271, (1972)
[3]  
Brannlund H., Sjelvgren D., Anderson N., Optimal short-term operation planning of a large hydrothermal power system based on a nonlinear network flow concept, IEEE Trans. Power Systems, 1, pp. 75-82, (1986)
[4]  
Dommel H.W., Tinney W.F., Optimal power flow solutions, IEEE Trans. Power Apparatus and Systems, 87, pp. 1866-1876, (1968)
[5]  
Yang J.-S., Chen N., Short-term hydrothermal coordination problem, IEEE Trans. Power Systems, 2, pp. 737-743, (1989)
[6]  
Knan M.A., Kuppusamy K., Optimum Load Curtailament under Emergency Conditions Using Constant Matrices', IEEE PES Winter Meeting, pp. 79113-79122, (1979)
[7]  
Kuppusamy K., Successive linear programming methods for security related optimization in power systems, Ph.D. Thesis, College of Engineering, Guindy, (1981)
[8]  
Nanda J., Bijwe P.R., Optimal hydrothermal scheduling with cascaded plants using progressive optimality algorithm, IEEE Trans. Power Apparatus and Systems, 100, pp. 2093-2099, (1981)
[9]  
Prakasa Rao K.S., Aggarwal R.P., Prabhu S.S., A two level approach for optimal scheduling in hydrothermal power systems using the method of local variations, IEEE PES Winter Meeting, (1975)
[10]  
Rashid A., Nor K.M., An efficient method for optimal scheduling of fixed head hydro and thermal plants, IEEE Trans, on Power Systems, 6, pp. 632-636, (1991)