SINGLE-MACHINE SCHEDULING PROBLEM WITH FUZZY PRECEDENCE RELATION

被引:48
作者
ISHII, H [1 ]
TADA, M [1 ]
机构
[1] RYUKOKU UNIV,FAC BUSINESS ADM,KYOTO 612,JAPAN
关键词
SCHEDULING THEORY; FUZZY PRECEDENCE RELATION; MULTICRITERIA PROBLEM; NONDOMINATED SCHEDULE;
D O I
10.1016/0377-2217(94)00162-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers the single machine scheduling problem with fuzzy precedence relation. A precedence relation is a binary relation between jobs, that is, 'Job J(j) precedes job J(i)' means that processing of job J(i) cannot be started till completion of job J(j), which reflects the technical ordering with respect to production, etc. The fuzzy precedence relation relaxes this restriction and it reflects the satisfaction level with respect to precedence between two jobs. Two objectives are considered, i.e., L(max) (maximum lateness) to be minimized, and minimal satisfaction level with respect to fuzzy precedence relation to be maximized. Analogously to ordinary multi-criteria problems, we define nondominated schedules and find them. In order to calculate nondominated schedules, we first define a schedule vector and then a nondominated schedule vector. Our aim is to propose an efficient algorithm for calculating nondominated schedules. Finally, we discuss further research problems in this direction.
引用
收藏
页码:284 / 288
页数:5
相关论文
共 3 条
[1]  
BLAZEWICZ J, 1987, ANN DISCRETE MATH, V31, P1
[2]   FUNCTIONAL EQUATION AND ITS APPLICATION TO RESOURCE ALLOCATION AND SEQUENCING PROBLEMS [J].
LAWLER, EL ;
MOORE, JM .
MANAGEMENT SCIENCE SERIES A-THEORY, 1969, 16 (01) :77-84
[3]  
Smith W.E., 1956, NAV RES LOGIST Q, V3, P59, DOI DOI 10.1002/NAV.3800030106