AN OPTIMAL BATCH SIZE FOR A PRODUCTION SYSTEM OPERATING UNDER A JUST-IN-TIME DELIVERY SYSTEM

被引:44
作者
JAMAL, AMM [1 ]
SARKER, BR [1 ]
机构
[1] LOUISIANA STATE UNIV,DEPT IND & MFG SYST ENGN,BATON ROUGE,LA 70803
关键词
Algorithms - Industrial management - Industrial plants - Production engineering;
D O I
10.1016/0925-5273(93)90072-S
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The model determines an economic manufacturing quantity and recommends a raw material ordering policy to deliver a fixed amount of finished products at a regular interval within the production cycle time. In this paper, we estimate the batch size from the lower bound concept of the JIT delivery amount. An efficient algorithm is developed to compute the optimal or near optimal batch sizes for both manufacturing and raw material ordering policies. Results and computational complexity of the problem are also discussed.
引用
收藏
页码:255 / 260
页数:6
相关论文
共 19 条
[1]  
Moden, What makes the Toyota production system really tick?, Ind. Eng., 13, 1, pp. 36-46, (1981)
[2]  
Porteus, Investing in reduced setups in the EOQ model, Management Science, 31, 8, pp. 998-1010, (1985)
[3]  
Chakraborty, Rao, EBQ for a multi-stage production system considering rework, Opsearch, 25, pp. 75-88, (1988)
[4]  
Chapman, Carter, Supplier/customer inventory relationships under just in time, Decision Sciences, 21, pp. 35-51, (1990)
[5]  
Lee, Ansari, Comparative analysis of Japanese just-in-time purchasing and traditional US purchasing systems, International Journal of Operations & Production Management, 5, 4, pp. 5-14, (1985)
[6]  
Newman, The buyer-supplier relationship under just in time, Prod. Inv. Mgmt., 29, 3, pp. 45-50, (1988)
[7]  
Pan, Liao, An inventory model under just-in-time purchasing agreements, Prod. Inv. Mgmt., 30, 1, pp. 49-52, (1989)
[8]  
Ramasesh, Recasting the traditional inventory model to implement just-in-time purchasing, Prod. Inv. Mgmt., 31, 1, pp. 71-75, (1990)
[9]  
Chakravarty, Martin, Operational economies of a process positioning determinant, Comp. Oper. Res., 18, 6, pp. 515-530, (1991)
[10]  
Schwarz, Schrage, Optimal and system myopic policies for multi-echelon production/inventory assembly systems, Management Science, 21, 11, pp. 1285-1294, (1975)