REVISITING THE MIXED-MODEL MULTILEVEL JUST-IN-TIME SCHEDULING PROBLEM

被引:14
作者
MILTENBURG, J
SINNAMON, G
机构
[1] School of Business, McMaster University, Hamilton, ON
[2] Department of Mathematics, University of Western Ontario, London, ON
关键词
Compilation and indexing terms; Copyright 2025 Elsevier Inc;
D O I
10.1080/00207549508904798
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Morabito and Kraus (1994) propose a modification to the mathematical model of the mixed-model, multi-level just-in-time (JIT) scheduling problem introduced in Miltenburg and Sinnamon (1989). In this note we relate their proposal to the goals of JIT production and emphasize the importance of using the weights in the original formulation to express management priorities.
引用
收藏
页码:2049 / 2052
页数:4
相关论文
共 5 条
[1]  
Miltenburg J., Sinnamon G., Scheduling mixed-model. Multi-lcvcl, just-in-time production systems, International Journal of Production Research, 27, (1989)
[2]  
Monden Y., Toyota Production System, (1983)
[3]  
Morabito M.A., Kraus M.E., A note on ‘Scheduling mixed-model, multi level. Just-in-time production systems, International Journal of Production Research, 33, (1994)
[4]  
Ohno T., Toyota Production System
[5]  
beyond Large-Scale Production, (1988)