A BROADER VIEW OF THE JOB-SHOP SCHEDULING PROBLEM

被引:93
作者
WEIN, LM [1 ]
CHEVALIER, PB [1 ]
机构
[1] MIT,OPERAT RES CTR,CAMBRIDGE,MA 02139
关键词
PRODUCTION SCHEDULING; QUEUING NETWORKS;
D O I
10.1287/mnsc.38.7.1018
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We define a job-shop scheduling problem with three dynamic decisions: assigning due-dates to exogenously arriving jobs, releasing jobs from a backlog to the shop floor, and sequencing jobs at each of two workstations in the shop. The job-shop is modeled as a multiclass queueing network and the objective is to minimize both the work-in-process (WIP) inventory on the shop floor and the due-date lead time (due-date minus arrival date) of jobs, subject to an upper bound constraint on the proportion of tardy jobs. A general two-step approach to this problem is proposed: (1) release and sequence jobs in order to minimize the WIP inventory subject to completing jobs at a specified rate, and (2) given the policies in (1), set due-dates that will attempt to minimize the due-date lead time, subject to the job tardiness constraint. A simulation study shows that this approach easily outperforms other combinations of traditional due-date setting, job release, and priority sequencing policies for two cases (moderately loaded and heavily loaded) of a particular shop. As a result of the study, three scheduling principles are proposed that can significantly improve the performance of a two-station job-shop; in particular, better due-date performance can be achieved by ignoring due-dates on the shop floor. Although we have only considered a two-station shop, the approach and scheduling principles presented here might also be useful for larger shops.
引用
收藏
页码:1018 / 1033
页数:16
相关论文
共 48 条
[1]   OPTIMAL PRIORITY-PURCHASING AND PRICING DECISIONS IN NONMONOPOLY AND MONOPOLY QUEUES [J].
ADIRI, I ;
YECHIALI, U .
OPERATIONS RESEARCH, 1974, 22 (05) :1051-1066
[3]  
Baker K.R., 1984, J OPER MANAGE, V4, P99, DOI [10.1016/0272-6963(84)90026-3, DOI 10.1016/0272-6963(84)90026-3]
[4]   A COMPARISON OF DUE-DATE SELECTION-RULES [J].
BAKER, KR ;
BERTRAND, JWM .
AIIE TRANSACTIONS, 1981, 13 (02) :123-131
[5]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[6]  
BALACHANDRAN KR, 1972, MANAGE SCI, V5, P316
[7]   THEORY AND PRACTICE OF LOAD-ORIENTED MANUFACTURING CONTROL [J].
BECHTE, W .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (03) :375-395
[8]  
BECHTE W, 1982, APICS 25 ANN INT C P, P67
[9]  
Bertrand J. W. M., 1981, Operational Research '81. Proceedings of the Ninth IFORS International Conference, P779
[10]   THE EFFECT OF WORKLOAD DEPENDENT DUE-DATES ON JOB SHOP PERFORMANCE [J].
BERTRAND, JWM .
MANAGEMENT SCIENCE, 1983, 29 (07) :799-816