LOAD SUPPLYING CAPABILITY OF GENERATION-TRANSMISSION NETWORKS

被引:42
作者
GARVER, LL
VANHORNE, PR
WIRGAU, KA
机构
[1] General Electric Company, Schenectady, New York
来源
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS | 1979年 / 98卷 / 03期
关键词
D O I
10.1109/TPAS.1979.319253
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes an extension of the power transfer capacity calculation to the calculation of maximum power system loading. This loading capability is a function of the generation and transmission capacity of the power system. The dc power flow equations provide a basis for the development of constraint equations necessary in the linear programming optimization of the generation-transmission system. An example is provided to illustrate the concepts of the load supplying capability of the power system, and the application to assessment of network adequacy and long range planning is discussed. Copyright © 1979 by The Institute of Electrical and Electronics Engineers, Inc.
引用
收藏
页码:957 / 962
页数:6
相关论文
共 17 条