RAMP BRIDGE INTERFACE IN RAILWAY PRESTRESSED CONCRETE BRIDGE

被引:16
作者
WANG, TL
机构
[1] Dept. of Civ. and Envir. Engrg., Florida Int. Univ., University Park, Miami, FL
来源
JOURNAL OF STRUCTURAL ENGINEERING-ASCE | 1990年 / 116卷 / 06期
关键词
D O I
10.1061/(ASCE)0733-9445(1990)116:6(1648)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The purpose of this paper is to study the factors that contribute to the dynamic behavior of railway ramp/bridge interfaces A nonlinear 100-ton freight car vehicle model (gross weight 131.5 tons) and a 50-ft (15.24-m) long ballasted prestressed concrete railway bridge were used to determine the approach of the ramp/bridge interface that creates the least dynamic response The track irregularities on the approach of the ramp/bridge interface and the bridge were generated from power spectral density functions for Federal Railroad Administration (FRA) Class 4 track (maximum speed 60 mph) Impact percentages in the bridge due to a two 100-ton freight car train operating at 50 mph (80.45 km/h) were calculated The influences of ramp length and vertical track stiffness in the ramp/bridge interface were studied. © ASCE.
引用
收藏
页码:1648 / 1659
页数:12
相关论文
共 13 条
[1]  
Bhatti M. H., 1982, THESIS ILLINOIS I TE
[2]   IMPACT IN RAILWAY PRESTRESSED CONCRETE BRIDGES [J].
CHU, KH ;
GARG, VK ;
WANG, TL .
JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1986, 112 (05) :1036-1051
[3]  
CHU KH, 1979, J STRUCT DIV-ASCE, V105, P1823
[4]   A STUDY OF RAILWAY BRIDGE VEHICLE INTERACTION AND EVALUATION OF FATIGUE LIFE [J].
GARG, VK ;
CHU, KH ;
WANG, TL .
EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1985, 13 (06) :689-709
[5]  
GUYAN RJ, 1965, AM I AERONAUT ASTRON, V3
[6]  
HAMID A, 1981, DOTFR8203 DEP TRANSP
[7]  
HERRMANN LR, 1968, USERS MANUAL 3 DIMEN
[8]  
Naaman A.E., 1982, PRESTRESSED CONCRETE
[9]  
TSE YH, 1976, R199 ASS AM RAILR RE
[10]  
Wang T., 1984, THESIS ILLINOIS I TE