EX POST TESTS FOR SHORT-RUN AND LONG-RUN OPTIMIZATION

被引:19
作者
CONRAD, K
UNGER, R
机构
关键词
D O I
10.1016/0304-4076(87)90006-6
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:339 / 358
页数:20
相关论文
共 17 条
[1]  
Applebaum E., 1978, J ECONOMETRICS, V7, P87
[2]   INTER-FUEL SUBSTITUTION IN STEAM ELECTRIC-POWER GENERATION [J].
ATKINSON, SE ;
HALVORSEN, R .
JOURNAL OF POLITICAL ECONOMY, 1976, 84 (05) :959-978
[3]   PRODUCTIVITY-MEASUREMENT WITH ADJUSTMENTS FOR VARIATIONS IN CAPACITY UTILIZATION AND OTHER FORMS OF TEMPORARY EQUILIBRIUM [J].
BERNDT, ER ;
FUSS, MA .
JOURNAL OF ECONOMETRICS, 1986, 33 (1-2) :7-29
[4]   CONFLICT AMONG CRITERIA FOR TESTING HYPOTHESES IN MULTIVARIATE LINEAR-REGRESSION MODEL [J].
BERNDT, ER ;
SAVIN, NE .
ECONOMETRICA, 1977, 45 (05) :1263-1277
[5]  
BERNDT ER, 1975, REV ECON STAT, V57, P259, DOI 10.2307/1923910
[6]  
BERNDT ER, 1979, AM ECON REV, V69, P342
[7]  
BERNDT ER, 1981, AM EC REV, V71, P5
[8]   RELATIVE PRODUCTIVITY LEVELS, 1947-1973 - AN INTERNATIONAL COMPARISON [J].
CHRISTENSEN, LR ;
CUMMINGS, D ;
JORGENSON, DW .
EUROPEAN ECONOMIC REVIEW, 1981, 16 (01) :61-94
[9]  
CONRAD K, 1985, PRODUCTIVITY GAPS CA
[10]   UNITED-STATES AND JAPANESE ECONOMIC-GROWTH, 1952-1974 - INTERNATIONAL COMPARISON [J].
JORGENSON, DW ;
NISHIMIZU, M .
ECONOMIC JOURNAL, 1978, 88 (352) :707-726