A HEURISTIC FOR MINIMIZING THE NUMBER OF TOOL SWITCHES ON A FLEXIBLE MACHINE

被引:90
作者
BARD, JF
机构
关键词
D O I
10.1080/07408178808966195
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:382 / 391
页数:10
相关论文
共 22 条
[1]   A COMPETITIVE (DUAL) SIMPLEX-METHOD FOR THE ASSIGNMENT PROBLEM [J].
BALINSKI, ML .
MATHEMATICAL PROGRAMMING, 1986, 34 (02) :125-141
[2]  
BARD JF, 1987, CUTTING PATH TOOL SE
[3]  
BARD JF, 1986, MODELLING DESIGN FLE, P33
[4]  
Bitran G., 1977, DECISION SCI, V8, P28, DOI 10.1111/j.1540-5915.1977.tb01066.x
[5]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[6]   MODELS FOR UNDERSTANDING FLEXIBLE MANUFACTURING SYSTEMS [J].
BUZACOTT, JA ;
SHANTHIKUMAR, JG .
AIIE TRANSACTIONS, 1980, 12 (04) :339-350
[7]   WORK SCHEDULING IN FMS UNDER TOOL AVAILABILITY CONSTRAINTS [J].
CARRIE, AS ;
PERERA, DTS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (06) :1299-1308
[8]  
Dupont-Gatelmand C., 1982, J MANUF SYST, V1, P1
[9]   LAGRANGEAN RELAXATION APPLIED TO CAPACITATED FACILITY LOCATION PROBLEMS [J].
GEOFFRION, A ;
MCBRIDE, R .
AIIE TRANSACTIONS, 1978, 10 (01) :40-47
[10]  
Geoffrion A., 1974, MATH PROGRAMMING STU, V2, DOI [10.1007/BFb0120690, DOI 10.1007/BFB0120686]