ONE-PHASE AND 2-PHASE HEURISTICS FOR WORKFORCE SCHEDULING

被引:29
作者
MCGINNIS, LF
CULVER, WD
DEANE, RH
机构
[1] School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta
关键词
D O I
10.1016/0360-8352(78)90003-7
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A common problem in manpower planning is the scheduling of employees to meet a fluctuating labor requirement. The problem has often been treated in the past by considering shift allocation and employee scheduling independently. In this paper we report on two heuristic procedures, one which uses the two-phase approach, and one which deals directly with the employee scheduling problem. © 1978.
引用
收藏
页码:7 / 15
页数:9
相关论文
共 15 条
[1]   SCHEDULING A FULL-TIME WORKFORCE TO MEET CYCLIC STAFFING REQUIREMENTS [J].
BAKER, KR .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (12) :1561-1568
[2]  
BAKER KR, 1972, OR83 N CAR STAT U RE
[3]  
BENNETT BT, 1968, TRANSPORT SCI, V2, P14
[4]  
DANTZIG G, 1954, OPER RES, V3, P339
[5]  
EDIE LC, 1954, OPER RES, V2, P107
[6]  
HEALY WC, 1959, FACTORY, V117
[7]   HEURISTIC METHODS FOR TELEPHONE OPERATOR SHIFT SCHEDULING - EXPERIMENTAL-ANALYSIS [J].
HENDERSON, WB ;
BERRY, WL .
MANAGEMENT SCIENCE, 1976, 22 (12) :1372-1380
[8]  
HENDERSON WB, 1975, 507 PURD U KRANN GRA
[9]  
LUCE BJ, 1974, APR JOINT NAT M ORSA
[10]  
LUCE BJ, 1973, 44TH NAT M ORSA