共 15 条
- [2] BALAS E, 1970, APPLICATIONS MATH PR
- [3] IMPROVED FEASIBILITY TEST FOR GORENSTEINS ALGORITHM [J]. OPERATIONS RESEARCH, 1974, 22 (05) : 1117 - 1119
- [4] DAVIS EW, 1971, MANAGE SCI B-APPL, V17, pB803
- [5] COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J]. MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08): : 944 - 955
- [6] ELMAGHRABY SE, S THEORY SCHEDULING, P294
- [8] GORENSTEIN S, 1972, OPER RES, V20, P835, DOI 10.1287/opre.20.4.835
- [9] GUTJHAR AL, 1964, MANAGEMENT SCI
- [10] Held M., 1974, Mathematical Programming, V6, P62, DOI 10.1007/BF01580223