AN ARTIFICIAL-INTELLIGENCE APPROACH TO THE SCHEDULING OF FLEXIBLE MANUFACTURING SYSTEMS

被引:26
作者
SHAW, MJ
WHINSTON, AB
机构
[1] UNIV ILLINOIS,BECKMAN INST ADV SCI & TECHNOL,CHAMPAIGN,IL 61820
[2] UNIV TEXAS,GRAD SCH BUSINESS,AUSTIN,TX 78712
[3] UNIV TEXAS,INST COMP 2,AUSTIN,TX 78712
关键词
D O I
10.1080/07408178908966221
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:170 / 183
页数:14
相关论文
共 39 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
BOURNE D, 1982, CMU R1 TR825 CARN ME
[3]  
BULLERS WI, 1980, AIIE T DEC, P351
[4]  
CHANG YL, 1984, 1ST P ORSA TIMS C FM
[5]  
Conway R, 1967, THEORY SCHEDULING
[6]  
CUTKOSKY, 1975, MANAGE SCI, V21, P944
[7]   LEARNING AND EXECUTING GENERALIZED ROBOT PLANS [J].
FIKES, RE ;
HART, PE ;
NILSSON, NJ .
ARTIFICIAL INTELLIGENCE, 1972, 3 (02) :251-288
[8]   STRIPS - NEW APPROACH TO APPLICATION OF THEOREM PROVING TO PROBLEM SOLVING [J].
FIKES, RE ;
NILSSON, NJ .
ARTIFICIAL INTELLIGENCE, 1971, 2 (3-4) :189-208
[9]  
FOX MS, 1983, CMRR1TR838 CARN MELL
[10]  
FOX MS, 1982, INTELLIGENT MANAGEME