INVENTORY MODELS INVOLVING LEAD TIME AS A DECISION VARIABLE

被引:195
作者
BENDAYA, M
RAOUF, A
机构
[1] King Fahd Univ of Petroleum and, Minerals, Dhahram, Saudi Arabia
关键词
CRASHING COST; INVENTORY MODEL; LEAD TIME;
D O I
10.1057/jors.1994.85
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Most of the literature dealing with inventory problems assumes lead time as prescribed, whether deterministic or probabilistic. In certain cases, lead time can be reduced but at an added cost. In this article we discuss inventory models where lead time is one of the decision variables.
引用
收藏
页码:579 / 582
页数:4
相关论文
共 7 条
  • [1] [Anonymous], 1988, J OPER MANAG, DOI DOI 10.1016/0272-6963(81)90008-5
  • [2] EFFECT OF LEAD TIME ON INVENTORY - STATIC ANALYSIS
    DAS, C
    [J]. OPERATIONAL RESEARCH QUARTERLY, 1975, 26 (02) : 273 - 282
  • [3] Johnson LA, 1974, OPERATIONS RES PRODU
  • [4] LIAO CJ, 1991, INT J OPER PROD MAN, V11, P72
  • [5] MAGSON DW, 1979, J OPER RES SOC, V30, P317
  • [6] Naddor E., 1966, INVENTORY SYSTEMS
  • [7] Silver EA., 1985, DECISION SYSTEMS INV