共 18 条
[1]
Brown D.W., Influences on cost of construction changes and forward change pricing report, (1988)
[2]
Construction Industry Institute, The impact of changes on construction cost and schedule, Rep. of Cost/Schedule Task Force, (1988)
[3]
Dellon A.L., Dellon I.J., Documentation and verification in the change order process, Trans, (1988)
[4]
Devore J.L., Probability and statistics for engineering and the sciences, (1991)
[5]
Dieterle R.A., Maziarz S.J., Substantiation of costs in construction claims, Cost Engrg, 33, 3, pp. 9-12, (1991)
[6]
Hester W.T., Kuprenas J.A., Chang T.C., Changes during construction and their impact: A review of the literature and development of management techniques, Draft Rep, (1988)
[7]
Leonard C.A., The effect of change orders on productivity. (1987), Revay Rep, 6, 2, pp. 1-3, (1987)
[8]
Sanders S.R., Thomas H.R., Factors affecting masonry productivity, J. Constr. Engrg. and Mgmt, 117, 4, pp. 621-644, (1991)
[9]
Thomas H.R., Procedures manual for collecting productivity and related data on the effects of changes on industrial construction projects: Electrical and piping, Final Rep, (1991)
[10]
Thomas H.R., Maloney W.F., Smith G.R., Sanders S.R., Horner R.M.W., Handa V.K., Productivity models for construction, J. Constr. Engrg. and Mgmt, 116, 4, pp. 705-726, (1990)