MINIMIZING THE EXPECTED WEIGHTED NUMBER OF TARDY JOBS IN STOCHASTIC FLOW SHOPS

被引:32
作者
BOXMA, OJ [1 ]
FORST, FG [1 ]
机构
[1] MARQUETTE UNIV,COLL BUSINESS ADM,MILWAUKEE,WI 53233
关键词
D O I
10.1016/0167-6377(86)90084-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:119 / 126
页数:8
相关论文
共 9 条
[1]  
Balut S. J., 1973, Management Science, V19, P1283, DOI 10.1287/mnsc.19.11.1283
[2]  
FORST FG, 1985, MINIMIZING EXPECTED
[3]   ON STOCHASTIC SCHEDULING PROBLEMS WITH DUE DATES [J].
GLAZEBROOK, KD .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1983, 14 (11) :1259-1271
[4]  
Karp R.M., 1972, COMPLEXITY COMPUTER
[5]   A POLYNOMIAL-TIME ALGORITHM FOR A CHANCE-CONSTRAINED SINGLE-MACHINE SCHEDULING PROBLEM [J].
KATOH, N ;
IBARAKI, T .
OPERATIONS RESEARCH LETTERS, 1983, 2 (02) :62-65
[6]   ON BALUT ALGORITHM AND NP-COMPLETENESS FOR A CHANCE-CONSTRAINED SCHEDULING PROBLEM [J].
KISE, H ;
IBARAKI, T .
MANAGEMENT SCIENCE, 1983, 29 (03) :384-388
[7]   AN EFFICIENT ALGORITHM FOR A CHANCE-CONSTRAINED SCHEDULING PROBLEM [J].
KISE, H ;
SHIOMI, A ;
UNO, M ;
CHAO, DS .
JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1982, 25 (02) :193-204
[8]   STOCHASTIC SCHEDULING WITH RELEASE DATES AND DUE DATES [J].
PINEDO, M .
OPERATIONS RESEARCH, 1983, 31 (03) :559-572
[9]  
STOYAN D, 1986, QUALITATIVE EIGENSCH