THE GOOD, THE BAD AND THE UGLY - QUALITY ON AN ASSEMBLY LINE

被引:8
作者
ROBINSON, LW
MCCLAIN, JO
THOMAS, LJ
机构
[1] S. C. Johnson Graduate School of Management, Cornell University, Ithaca, NY
关键词
D O I
10.1080/00207549008942767
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Firms can handle defects that occur on an assembly line in a number of different ways. Traditionally, defective units were either scrapped or sent to a separate repair station. With the advent of Japanese production methodology in the US, line-stop buttons were introduced to assembly lines; when a defect was discovered, the assembly line was stopped and the defect was repaired immediately (on-line repair). We develop a relatively simple model of the assembly line to compare these alternate strategies and derive some qualitative insights into this problem. Our primary performance measures are the production throughput rate, the work-in-process inventory level (WIP), and the field defect rate. We use both queuing theory and simulation to estimate these measures for the different strategies Of course, not all defects can be detected. The presence of imperfect inspection complicates the analysis, requiring us to determine values for probabilities of defects and inspection errors that are consistent with the factory that gave rise to this investigation Two standard advantages of on-line repair are faster on-the-spot repairs and a heightened awareness of the consequences of defects, resulting in a drop in the defect rate. But even after adjusting for the advantages, we find that in many instances online repair results in a lower throughput rate than the traditional off-line repair shop. The most effective strategy subdivides the production line and uses WIP buffers between the segments to limit the propagation of line stoppages. Adding small amounts of WIP substantially increases the output of the production line. © 1990 Taylor & Francis Group, LLC.
引用
收藏
页码:963 / 980
页数:18
相关论文
共 43 条
[1]  
Anderson D.R., Moodik C.L., Optimal buffer storage capacity in production line systems, International Journal of Production Research, 7, pp. 233-240, (1969)
[2]  
Ballou D.P., Pazfr M.L., The impact of inspector fallibility on the inspection policy in serial production systems, Management Science, 28, pp. 387-399, (1982)
[3]  
Ballou D.P., Pazer M.L., Process improvement versus enhanced inspection in optimized systems, International Journal of Production Research, 23, pp. 1233-1245, (1985)
[4]  
Barlow R.E., Proschan F., Statistical Theory of Reliability and Life Testing, (1975)
[5]  
Burlakov Y., A quality control optimization method (In Russian), Avtomatika I Telemechanika, 2, pp. 111-119, (1977)
[6]  
Buzacott J.A., Automatic transfer lines with buffer stocks, International Journal of Production Research, 5, pp. 183-200, (1967)
[7]  
Buzacott J.A., Methods of reliability analysis of production systems subject to breakdowns, Operations Research and Reliability, (1971)
[8]  
Buzacott J.A., Hanifin L.E., Models of automatic transfer lines with inventory banks: A review and comparison, AIIE Transactions, 10, pp. 197-207, (1978)
[9]  
Carter J.C., Silverman F.N., A cost-effective approach to stochastic line balancing with off-line repairs, Journal of Operations Management, 4, pp. 145-157, (1984)
[10]  
Collins R.D., Case K.E., The distribution of observed defectives in attribute acceptance sampling plans under inspection error, AIIE Transactions, 8, pp. 375-378, (1976)