A SLAM-II SIMULATION STUDY OF A SIMPLIFIED FLOWSHOP

被引:27
作者
BARRETT, RT
BARMAN, S
机构
关键词
D O I
10.1177/003754978604700502
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:181 / 189
页数:9
相关论文
共 62 条
[1]   PRIORITY UPDATE INTERVALS AND ANOMALIES IN DYNAMIC RATIO TYPE JOB SHOP SCHEDULING RULES [J].
ADAM, NR ;
SURKIS, J .
MANAGEMENT SCIENCE, 1980, 26 (12) :1227-1237
[2]   GASP SIMULATION STUDY OF JOB-SHOP SCHEDULING [J].
ASHOUR, S ;
VASWANI, SD .
SIMULATION, 1972, 18 (01) :1-&
[3]   SIMULATION OF A SIMPLIFIED JOB SHOP [J].
BAKER, CT ;
DZIELINSKI, BP .
MANAGEMENT SCIENCE, 1960, 6 (03) :311-323
[4]  
Baker K.R., 1983, J OPERATIONS MANAGEM, V4, P11
[5]  
Baker K. R., 1981, J OPER MANAGE, V1, P109
[6]   A COMPARISON OF DUE-DATE SELECTION-RULES [J].
BAKER, KR ;
BERTRAND, JWM .
AIIE TRANSACTIONS, 1981, 13 (02) :123-131
[7]  
BAKER KR, 1984, INT J PROD RES, V22, P917, DOI 10.1080/00207548408942511
[8]   SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP [J].
BAKER, KR .
MANAGEMENT SCIENCE, 1984, 30 (09) :1093-1104
[9]   FINDING AN OPTIMAL SEQUENCE BY DYNAMIC-PROGRAMMING - EXTENSION TO PRECEDENCE-RELATED TASKS [J].
BAKER, KR ;
SCHRAGE, LE .
OPERATIONS RESEARCH, 1978, 26 (01) :111-120
[10]  
Berry W.L., 1972, AIIE T, V4, P267