ASSEMBLY OF SIMULATION NETWORKS USING DESIGNS, PLANS, AND METHODS

被引:15
作者
TOMMELEIN, ID
CARR, RI
ODEH, AM
机构
[1] Civ. and Envir. Engrg. Dept, Univ. of Michigan, Ann Arbor
[2] Civ. and Envir. Engrg. Dept, Univ. of Michigan, Ann Arbor, MI
[3] Civ. Engrg. Dept, Jordan Univ. of Sci. and Technol, Irbid
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1994年 / 120卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1994)120:4(796)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An object-oriented and interactive computer system is presented that realistically models construction processes by matching resource properties with design component properties and operation durations. This system, named CIPROS, uses a modular representation to create discrete-event simulation networks, and to aid in relating simulation output back to the design and construction plan of a facility to be built. CIPROS users must identify and describe attributes of components to be constructed, based on the facility's design drawings and specifications, and they must develop a critical path method (CPM) plan. They must also select a construction method to perform each activity by retrieving the appropriate elemental simulation network from a library of networks that represent such methods. CIPROS then pieces together the networks based on sequential relationships from the plan and property values input from the drawing and specification data. The latter initialize the simulation network resources that make up the constructed facility. To complete the simulation network, users must specify the construction resources that are available to perform the work and which may be shared by activities. CIPROS comprises a fully operational discrete-event simulation engine that is called once a network is completed. Besides producing statistical reports that are instrumental in assessing the quality of the construction plan, CIPROS can also be used to check the degree of facility completion as the simulation progresses.
引用
收藏
页码:796 / 815
页数:20
相关论文
共 30 条
[1]  
Abourizk S.M., Halpin D.W., Modeling input data for construction simulation, Proc., 8th Conf. Computing in Civ. Engrg. and Symp. on Geographical Information Systems, pp. 1147-1154, (1992)
[2]  
Bernold L.E., Simulation of nonsteady construction processes, J. Constr. Engrg. and Mgmt, 115, 2, pp. 163-178, (1989)
[3]  
Carr R.I., Simulation of construction project duration, J. Constr. Div, 105, 2, pp. 117-128, (1979)
[4]  
Chang D.Y., RESQUE: A resource based simulation for construction process planning, (1986)
[5]  
Cherneff J., Logcher R., Sriram D., Integrating CAD with construction-schedule generation, J. Computing in Civ. Engrg, 5, 1, pp. 64-84, (1991)
[6]  
Dabbas M., Halpin D.W., Integrated project and process management, J Constr. Div, 108, pp. 361-374, (1982)
[7]  
Franz M., Object-Oriented Programming Featuring Actor, (1989)
[8]  
Halpin D.W., Microcyclone User’s Manual, (1989)
[9]  
Halpin D.W., Riggs L.S., Planning and Analysis of Construction Operations, (1992)
[10]  
Huang R.-Y., Halpin D.W., Dynamic interface simulation of construction operations, Proc., 10th ISARC, Automation and Robotics in Construction, pp. 503-510, (1993)