共 12 条
[1]
Artamonov G.T., Productivity of a two-instrument discrete processing line in the presence of failures, Cybernetics, 12, (1976)
[2]
Buzaoott J.A., Automatic transfer lines with buffer stocks, Int. J. Prod. Res, 5, (1967)
[3]
Gershwin S.B., Schjck I.C., Analytic methods for calculating performance measures of production lines with buffer storages, Proceedings of the 1978 IEEE Conference on Decision and Control, (1978)
[4]
Hanifin L.E., Liberty S.G., Taraman K., Improved Transfer Line Efficiency Utilizing Systems Simulation, pp. 75-169, (1975)
[5]
Hillibr P.S., Bolino R.W., The effect of some design factors on the efficiency of production lines with variable operation times, J. Ind. Eng, 17, (1966)
[6]
Ionall E., Silver A., The output of a two-stage system with unreliable machines and limited storage, AIIE, 9, (1977)
[7]
Kraemer S.A., Love R.F., A model for optimizing the buffer inventory storage size in a sequential production system, AIIE, 2, (1970)
[8]
Masso J., Smith M.L., Interstage storage for three-stage lines subject to stochastic failures, AIIE, 6, (1974)
[9]
Okamura K., Yamashina H., Analysis of the cffcct of buffer storage capability in transfer line systems, AIIE, 9, (1977)
[10]
Rao N.P., Two-stage productions systems with intermediate storage, A IIE Trans, 7, (1975)

