PRODUCTION SCHEDULING PROBLEM IN THE GLASS-CONTAINER INDUSTRY

被引:32
作者
PAUL, RJ
机构
关键词
D O I
10.1287/opre.27.2.290
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
By means of computer simulation, an examination is made of the problem of scheduling parallel production lines in the glass-container industry with a resource constraint imposed by the furnace melting rate. The results of the simulation model are combined with relevant aspects of scheduling theory to arrive at the conclusion that a shortest processing time based dispatching rule probably provides the most efficient operating policy.
引用
收藏
页码:290 / 302
页数:13
相关论文
共 7 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
Coffman E.G., 1976, COMPUTER JOB SHOP SC
[3]  
Conway R, 1967, THEORY SCHEDULING
[4]   SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
HAESSLER, RW ;
HOGUE, SL .
MANAGEMENT SCIENCE, 1976, 22 (08) :909-912
[5]  
PAUL RJ, 1973, THESIS U HULL
[6]  
SHANKS RW, 1970, OPERATIONAL RES SOC, P10
[7]  
SHANKS RW, 1971, PRODUCTION SCHEDULIN, P54