共 51 条
- [1] Adams J.R., Martin M.D., A practical approach to the assessment of project uncertainty, Proc., Proj. Mgmt. Inst, (1982)
- [2] Ahuja H.N., Nandakumar V., Enhancing reliability of project duration forecasts, Trans. Amer. Association of Cost Engr, (1984)
- [3] Arditi D., A comparison of attitudes to planning in industrialized and developing countries, Proc., PMI (Project Management Institute) INTERNET Joint Symp, pp. 641-649, (1981)
- [4] Baldwin J.R., Causes of delays in the construction industry, J. Constr. Div, 97, 2, pp. 177-187, (1971)
- [5] Barrie D.S., Directions in Managing Construction, (1981)
- [6] Benjamin N.B., Greenwald T.W., Simulating effects of weather on construction, J. Constr. Div, 99, 1, pp. 175-189, (1973)
- [7] Birrel G.S., Discussion of ‘Criticism of CPM for project planning analysis, by Ali Jaafari.”, J. Constr. Engrg. and Mgmt, 113, 2, pp. 343-347, (1987)
- [8] Bowen P.A., Cost modelling and price forecasting: Practice and theory in perspective, Constr. Mgmt. and Economics, 3, 3, pp. 199-215, (1985)
- [9] Cohenca D., Laufer A., Ledbetter W.B., Factors affecting construction planning efforts, Constr. Engrg. and Mgmt, 115, 1, pp. 70-89, (1989)
- [10] Conover W.J., Practical Non Parametric Statistics, (1980)