共 15 条
[1]
OPTIMAL PRODUCTION PLAN IN A TOOL WEAR PROCESS WITH REWARDS FOR ACCEPTABLE, UNDERSIZED AND OVERSIZED PARTS
[J].
ENGINEERING COSTS AND PRODUCTION ECONOMICS,
1987, 11 (01)
:13-19
[5]
ECONOMIC SELECTION OF A PROCESS LEVEL UNDER ACCEPTANCE SAMPLING BY VARIABLES
[J].
ENGINEERING COSTS AND PRODUCTION ECONOMICS,
1989, 16 (01)
:69-78
[6]
CARLSSON O, 1990, STATISTICAL STUDIES, V16
[7]
Forsythe GE., 1977, COMPUTER METHODS MAT
[9]
HUNTER WG, 1977, J QUAL TECHNOL, V9, P176