共 11 条
[1]
Afentakis P., Simultaneous lot-sizing and sequencing for multistage production systems, II E Transactions, pp. 327-331, (1985)
[2]
Akella R., Rajagopal S., Kumar P., Part dispatch in multi-stage card lines, Proceedings Of, pp. 143-146, (1986)
[3]
Baker R.K., Scheduling the production of components at a common facility, IEEE Transactions, 20, pp. 32-35, (1988)
[4]
Boyle C., The benefits of Group Technology software for manufacturing, Proceedings of the IMTS Conference, pp. 1042-1045, (1986)
[5]
Burbridge I.L., The Introduction Ofgroup Technology, (1975)
[6]
Carmon T., Maimon O., Darel E.M., Group set-up for 'printed circuit board assembly, International Journal of Production Research, 27, pp. 1795-1810, (1989)
[7]
Gershwin S.B., Stochastic Scheduling and Set-Up in Flexible Manufacturing Systems, (1986)
[8]
King J.R., Nakornchai V., Machine component group formation in group technology: Review and extension, International Journal Ofproduction Research, 20, (1984)
[9]
Maimon O., Darel E.M., Freed T., Scheduling Methods for Printed Circuit Board Assembly, (1989)
[10]
Maxwell W.L., Uckstadt I.A., Establishing consistent and realistic reorder intervals in production-distribution systems, Operations Research, 33, pp. 1316-1341, (1985)