CONSTRUCTION COST FACTORS IN NIGERIA

被引:50
作者
ELINWA, AU
BUBA, SA
机构
[1] Dept. of Civ. Engrg., Abubakar Tafawa Balewa Univ., Dept. of Build, Bauchi
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1993年 / 119卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1993)119:4(698)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cost of materials, fraudulent practices and kickbacks, and fluctuation of prices of materials are three of the most important factors, among other factors, leading to high construction costs in Nigeria. Analyses of results leading to high construction costs show excellent agreement between the responses of the professionals (architects, engineers, and quantity surveyors) and the results of past researchers, with a Kendell's coefficient (tau) of 0.002 and 0.001, and a chi-square (chi2) of 6.60 and 4.06, respectively.
引用
收藏
页码:698 / 713
页数:16
相关论文
共 9 条
[1]  
Akinwonmi A.A., Waste management on construction site, The Nigerian Quantity Surveyor, 12, July, pp. 14-19, (1991)
[2]  
Barnett D.L., Et al., “Introductory Statistical Analysis, (1983)
[3]  
Charles T.J., Andrew M.A., Predictors of cost-overrun rates, J. Constr. Engrg. and Mgmt, 116, 3, (1990)
[4]  
National Construction Policy Launched, The Nigerian Quantity Surveyor, 12, July, pp. 24-26, (1991)
[5]  
Okpala C.C., Aniekwu A.N., Causes of high costs of construction in Nigeria, J. Constr. Engrg. and Mgmt., 114, 2, (1988)
[6]  
Seeley I.H., Building Economics, (1983)
[7]  
Spigel M.R., Scheums outline of theory and problems of statistics, (1981)
[8]  
3 day workshop on standard form of contract for building and housing projects in Nigeria, The Nigerian Quantity Surveyor, 12, July, (1991)
[9]  
Zaki M.K., James E.D., Concurrent delays in construction projects, J. Constr. Engrg. and Mgmt, 113, 4, (1987)