MODEL FOR PREDICTING RISK IN SCHEDULING PROPOSED R AND D TASKS

被引:3
作者
DOERING, RD
机构
关键词
D O I
10.1109/TEM.1970.6448527
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:80 / &
相关论文
共 18 条
[1]  
BARISH NN, 1962, ECONOMIC ANALYSIS
[2]  
BASTRESS EK, 1965, MANAGEMENT FACTORS A
[3]  
CHURCHMAN CW, 1954, J OP RES SOC AM, P172
[4]  
CLAUSEN IM, 1964, RISK ANALYSIS PROGRA
[5]   AN EXPERIMENTAL APPLICATION OF THE DELPHI METHOD TO THE USE OF EXPERTS [J].
DALKEY, N ;
HELMER, O .
MANAGEMENT SCIENCE, 1963, 9 (03) :458-467
[6]  
DEAN BV, 1963, OPERATIONS RESEARCH
[7]  
DOERING RD, 1968, THESIS U SOUTHERN CA
[8]  
DREZNER SM, 1966, RM4976NASA RAND CORP
[9]  
FREEMAN RJ, 1965, AD469625 REPT
[10]  
FREEMAN RJ, 1960, IRE T ENGINEERING MA, VEM 7, P103