共 37 条
[1]
Apple J.M., Material Handling Systems Design, (1972)
[2]
Cesarone J., Eman K.F., Mobile robot routing with dynamic programming, Journal of Manufacturing Systems, 8, 4, pp. 257-266, (1989)
[3]
Danikls S.C., Real Time Conflict Resolution in Automated Guided Vehicle Scheduling, (1988)
[4]
Egbelu P.J., A Methodology for the Design of Automated Guided Vehicle Based Material Handling Systems, (1982)
[5]
Egbelu P.J., Unit load design for minimum cost manufacture in an automated guided vehicle based transport system, Proceedings, 1, (1986)
[6]
Egbelu P.J., Ttie use of nonsimulation approaches in estimating vehicle requirements in automated guided vehicle based transport system, Material Flow, 4, 3-4, pp. 17-32, (1987)
[7]
Egbelu P.J., Route selection and flow control in a multi-stage manufacturing system with heterogeneous machines within stage, International Journal of Production Research, 28, 11, pp. 2137-2155, (1990)
[8]
Egbelu P.J., Reduction of manufacturing lead time through selection of machining rate and unit handling size, Engineering Costs and Production Economics, 21, pp. 21-34, (1991)
[9]
Egbelu P.J., Concurrent specification of unit load sizes and automated guided vehicle fleet size in manufacturing, International Journal of Production Economics, 29, pp. 49-64, (1993)
[10]
Egbelu P.J., Roy N., Material flow control in AGV/unit load based production lines, International Journal of Production Research, 26, 1, pp. 81-94, (1988)