PLANNING FACILITIES AT THE UNIVERSITY-OF-MISSOURI-ROLLA

被引:36
作者
BENJAMIN, CO [1 ]
EHIE, IC [1 ]
OMURTAG, Y [1 ]
机构
[1] SE MISSOURI STATE UNIV,DEPT MANAGEMENT,CAPE GIRARDEAU,MO 63701
关键词
D O I
10.1287/inte.22.4.95
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We used an integrated multiobjective decision model to guide decision making in allocating space when planning facilities in an academic environment. To help facilities planners to prioritize the often conflicting teaching, research, and extension service goals, we used the analytic hierarchy process (AHP). We then incorporated this priority structure into a linear goal programming (LGP) model that determines the optimum space allocation. The model was used to plan a computer integrated manufacturing (CIM) laboratory.
引用
收藏
页码:95 / 105
页数:11
相关论文
共 19 条
[1]   A MULTIOBJECTIVE METHODOLOGY FOR SELECTING SUBSYSTEM AUTOMATION OPTIONS [J].
BARD, JF .
MANAGEMENT SCIENCE, 1986, 32 (12) :1628-1641
[2]  
CHARNES A, 1961, MANAGEMENT MODELS IN, V1
[3]   A HIERARCHICAL GOAL-PROGRAMMING APPROACH TO REVERSE RESOURCE-ALLOCATION IN INSTITUTIONS OF HIGHER-LEARNING [J].
DIMINNIE, CB ;
KWAK, NK .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1986, 37 (01) :59-66
[4]  
FOREMAN E, 1986, EXPERT CHOICE
[5]  
GASS SI, 1986, J OPER RES SOC, V37, P770
[6]  
HARKER PT, 1988, TIMS ORSA NATIONAL M
[7]   GENERALIZED GOAL PROGRAMMING - AN OVERVIEW [J].
IGNIZIO, JP .
COMPUTERS & OPERATIONS RESEARCH, 1983, 10 (04) :277-289
[8]  
IGNIZIO JP, 1980, COMPUT OPER RES, V3, P217
[9]  
LEE SM, 1972, MANAGE SCI B-APPL, V18, pB395
[10]  
Muther R., 1973, SYSTEMATIC LAYOUT PL, V2nd