摘要
In this paper we consider the context of a major project whose execution takes several periods. Specifically we are interested in the procurement policy for a resource (material, commodity or engineered item) that is used throughout the project. Two types of uncertainty are considered, namely (i) uncertainty in the requirements, period by period, and (ii) uncertainty in the capacity, period by period, of the supplier providing the resource. There is the possibility of paying a premium to reserve dedicated capacity that can vary from period to period. Hence, the first group of decision variables are the capacities to reserve, period by period. There is.typically a long lead time involved so that all the capacities must be reserved prior to the first replenishment decision. The second class of decision variables encompasses the procurement quantities, period of period. These decisions can be made as the project progresses. We present some general approaches to dealing with this complex problem as well as some important insights.
引用
收藏
页码:177 / 182
页数:6
相关论文
共 7 条
[1]  
Silver, Policy and procedural issues in procurement and logistics for large scale projects in the oil and gas industry, Project Mgmt. J., 18, pp. 57-67, (1987)
[2]  
Feller, An Introduction to Probability Theory and Its Applications, 2, pp. 355-356, (1966)
[3]  
Burstein, Nevison, Carlson, Dynamic lot-sizing when demand timing is uncertain, Oper. Res., 32, pp. 362-379, (1984)
[4]  
Silver, Peterson, Decision Systems for Inventory Management and Production Planning, pp. 398-406, (1985)
[5]  
Jain, Silver, The single period procurement problem where dedicated supplier capacity can be reserved, Working Paper 92-10, (1992)
[6]  
Ciarallo, Akella, Morton, A periodic review, production planning model with uncertain capacity and uncertain demand, GSIA Working Paper No. 88-89-87, (1989)
[7]  
Ward, Chapman, Klein, Theoretical versus applied models: The newsboy problem, OMEGA, 19, pp. 197-206, (1991)