ESTIMATING A PROJECTS COMPLETION TIME DISTRIBUTION USING INTELLIGENT SIMULATION METHODS

被引:9
作者
COOK, TM [1 ]
JENNINGS, RH [1 ]
机构
[1] UNIV TEXAS,AUSTIN,TX 78712
关键词
D O I
10.2307/3009433
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:1103 / 1108
页数:6
相关论文
共 15 条
[1]  
burt J. M. Jr., 1971, INFOR. Canadian Journal of Operational Research and Information Processing, V9, P248
[2]  
BURT JM, 1971, MANAGE SCI, V19, P207
[3]  
CLINGEN CT, 1964, OPER RES, V11, P629
[4]  
COOK TM, 1976, 8TH P ANN AIDS C, P122
[5]  
ELMAGHRABY SW, 1967, MANAGE SCI, V13, P340
[6]   EXPECTED CRITICAL PATH LENGTHS IN PERT NETWORKS [J].
FULKERSON, DR .
OPERATIONS RESEARCH, 1962, 10 (06) :808-817
[7]  
HARTLEY HO, 1966, MGMT SCI, V22, P569
[8]   BOUNDING DISTRIBUTIONS FOR A STOCHASTIC ACYCLIC NETWORK [J].
KLEINDORFER, GB .
OPERATIONS RESEARCH, 1971, 19 (07) :1586-+
[9]  
Klingel A., 1966, MANAGE SCI, V13, P476, DOI DOI 10.1287/MNSC.13.4.B194
[10]  
MACCRIMMON KR, 1965, OPNS RES, V12, P404