A COMPREHENSIVE APPROACH TO PRODUCTION PLANNING IN MULTIPURPOSE BATCH PLANTS

被引:18
作者
LAZARO, M [1 ]
ESPUNA, A [1 ]
PUIGJANER, L [1 ]
机构
[1] UNIV POLITECN CATALUNYA,ETSIIB,DEPT CHEM ENGN,DIAGONAL 647,E-08028 BARCELONA,SPAIN
关键词
D O I
10.1016/0098-1354(89)87045-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:1031 / 1047
页数:17
相关论文
共 30 条
[1]  
BAMOPOULOS GS, 1982, COMPUTER AIDED DESIG
[2]  
EGLI UM, 1981, AICHE M
[3]   OPTIMUM DESIGN OF MULTIPURPOSE CHEMICAL-PLANTS [J].
GROSSMANN, IE ;
SARGENT, RWH .
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1979, 18 (02) :343-348
[4]   MINIMIZATION OF CAPITAL INVESTMENT FOR BATCH PROCESSES [J].
HELLINCKX, LJ ;
RIJCKAERT, MJ .
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1971, 10 (03) :422-+
[5]   ON THE SOLUTION OF SCHEDULING PROBLEMS FOR MULTI-PURPOSE BATCH CHEMICAL-PLANTS [J].
JANICKE, W .
COMPUTERS & CHEMICAL ENGINEERING, 1984, 8 (06) :339-343
[6]  
JEDLOVSKY P, 1984, 8TH INT C CHEM ENG C
[7]   DETERMINISTIC VARIABILITY ANALYSIS FOR INTERMEDIATE STORAGE IN NONCONTINUOUS PROCESSES .1. ALLOWABILITY CONDITIONS [J].
KARIMI, IA ;
REKLAITIS, GV .
AICHE JOURNAL, 1985, 31 (09) :1516-1527
[8]  
KARIMI IA, 1985, ICHEME S SER, V92, P79
[9]  
KETNER SE, 1960, CHEM ENG, V67, P121
[10]   OPTIMAL-DESIGN OF BATCH SEMI-CONTINUOUS PROCESSES [J].
KNOPF, FC ;
OKOS, MR ;
REKLAITIS, GV .
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1982, 21 (01) :79-80